Cabinet and document revision briefing

MFG-EL01-P01 · Concept training procedure draft · D1 · 29 October 2026

For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

Equipment MFG-EL01 · model 1.0.0-concept · source: original concept, approved SOP absent.

  1. Confirm equipment and task identity.

    MFG-EL01 · Control-cabinet revision trainer. Record draft D1 and model 1.0.0-concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  2. Confirm the inert training boundary.

    For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  3. Identify CAB-01 and REV-PLATE.

    This is an unwired, de-energised training concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  4. Locate PLC-01, PSU-01 and RELAY-01.

    The labels identify props, not accepted installed devices.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  5. Locate the DIN rails and training terminals.

    No actual wiring relationship is represented.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  6. Compare the layout with the drawing request.

    A current permitted layout and device list are required.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  7. Record the drawing and device revisions as unavailable.

    Do not invent part numbers or applicability.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  8. Identify the qualified electrical task owner.

    The public lesson cannot establish work authority.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  9. List the missing inspection and access rules.

    No live-work or isolation method is supplied.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  10. Hold any physical cabinet instruction.

    A rendered de-energised state is not an electrical safety verification.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  11. Prepare the evidence record.

    Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  12. Request qualified review before reuse.

    Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

Qualified source, geometry and procedure review required before operational reuse.