Circuit and source familiarisation

MFG-PN01-P01 · Concept training procedure draft · D1 · 29 October 2026

For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

Equipment MFG-PN01 · model 1.0.0-concept · source: original concept, approved SOP absent.

  1. Confirm equipment and task identity.

    MFG-PN01 · Pneumatic fault-learning panel. Record draft D1 and model 1.0.0-concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  2. Confirm the inert training boundary.

    For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  3. Identify PANEL-01 and its training tag.

    The panel is an unpressurised concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  4. Locate INLET-01 and FILTER-01.

    No air supply is connected or represented as safe.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  5. Locate REG-01 and GAUGE-01.

    The gauge is a non-reading prop.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  6. Locate VALVE-01, CYL-01 and ROD-01.

    Record component identities without inferring a validated circuit.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  7. Trace the visible line segments.

    The schematic relationship requires the approved circuit drawing.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  8. List stored-energy questions.

    A model cannot verify depressurisation or isolation.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  9. Request device and drawing revisions.

    The physical asset must match the permitted source.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  10. Hold any real intervention.

    No pressurised work or actuation is authorised.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  11. Prepare the evidence record.

    Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  12. Request qualified review before reuse.

    Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

Qualified source, geometry and procedure review required before operational reuse.