MANUFACTURING / WORK INTELLIGENCE
Image libraryPracticeEON AI Ventures ↗

Concept training procedure draft

Source and format-part briefing

MFG-CV01-P01 · Conveyor changeover rig · 12 steps for inert model familiarisation and reviewed decision practice.

Read the draft before the model.

Concept training procedure draft · D1 · 29 October 2026

For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

Original authored concept; no approved customer/OEM SOP supplied.

MFG-CV01-P01MFG-CV01MODEL 1.0.0-concept

12 authored steps

A sequence with visible evidence gates.

  1. Confirm equipment and task identity.

    MFG-CV01 · Conveyor changeover rig. Record draft D1 and model 1.0.0-concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  2. Confirm the inert training boundary.

    For the inert browser model only. Not an approved operating SOP. No physical work, production release or certification is authorised.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  3. Read FMT-A → FMT-B in the task brief.

    Record the requested target format; do not infer it from bottle appearance.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  4. Locate RAIL-L, RAIL-R and HW-01.

    Use the model picker and identify the coupled guide concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  5. Locate GB-A1 r1 on the comparison rack.

    Record that it belongs to Format A in this authored concept.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  6. Compare GB-B2 r2 with GB-B1 r1.

    Preserve both identifiers and revisions; shape similarity is insufficient.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  7. Review the concept applicability table.

    FMT-B maps to GB-B2 r2; this is an authored training rule awaiting an approved source.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  8. Select GB-B1 r1 as a deliberate wrong choice in practice.

    The practice must enter HOLD before continuing.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  9. Use the source check to recover to GB-B2 r2.

    Keep the initial error and the correction in the local attempt record.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  10. List the missing operating inputs.

    No approved SOP, pin tolerance, guide setting or first-piece criterion is supplied.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  11. Prepare the evidence record.

    Record observations, source revisions, holds, recovery and missing physical evidence; do not invent a result.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

  12. Request qualified review before reuse.

    Keep this draft unapproved until the task owner accepts the sources, geometry, criteria, permissions and revision.

    Hold if: Identity, source applicability or required evidence is missing or inconsistent.

Keep the equipment and source together.

Open Conveyor changeover rig

Referenced components: RAIL-L, RAIL-R, GB-B2, HW-01, PIN-01, PIN-02, GB-B1, SAMPLE-01.

Required operating inputs: Permitted rig CAD or multi-angle images; part applicability table; changeover and first-piece SOPs; source-defined travel and fit criteria.