Changeover readiness / packaging

Catch the obsolete part.
Before handover.

Two similar change parts. One current setup record. The learner checks the required format and revision before the next shift inherits the setup.

Two technicians compare separate change-part assemblies and a setup sheet beside a stopped, guarded packaging line.
Illustrative use-case scene · representative equipment and people. This scene is separate from the MFG-CV01 concept model. It is not an OEM/customer capture or a model-reference pack.

The task / the decision / the evidence

A familiar shape is only the start.

A learner takes over a stopped bottle-format changeover. A current job pack sits beside an obsolete look-alike change part. The task is to compare the part with the required format and revision, then prepare an evidence record the next shift can trust.

01 / Compare the source

Which part belongs to this format?

Check the current setup record and part applicability. In the authored MFG-CV01 training concept, FMT-B requires GB-B2 r2; GB-B1 r1 is the obsolete look-alike.

02 / Hold and recover

Keep the mismatch visible.

A wrong revision puts the browser practice on HOLD. Consult the concept source and recover to the applicable part. The initial mistake remains in the attempt record.

03 / Hand back the evidence

What still needs a physical check?

Keep the source revision, part decision and missing first-piece evidence together. A completed model adjustment does not supply a measured physical result or release the line.

Value to test

Less searching. Fewer repeat setup questions.

Agree a baseline with production engineering before comparing time to find the current change-part information, repeat setup corrections and reviewer effort. These are pilot hypotheses; customer outcomes have not been established.

Inputs for the first pilot

One permitted equipment source, current and obsolete part examples, the applicable setup and first-piece procedure, and a named task owner. The public model and procedure downloads remain illustrative training drafts.

Discuss this changeover

Context → practice → evidence.

Context

01 / Establish the source

Permitted rig CAD or multi-angle images; part applicability table; changeover and first-piece SOPs; source-defined travel and fit criteria.

Explore

Practice

02 / Rehearse the decision

Rehearse a bottle-format A-to-B changeover and reject an obsolete lookalike block.

Explore

Evidence & release

03 / Review the result

A versioned part decision, guide-setting rehearsal and explicit first-piece evidence gap.

Explore

The equipment behind the journey.

Illustrative Manufacturing workflow

MFG-CV01 · original concept GLB

Conveyor changeover rig

Rehearse a bottle-format A-to-B changeover and reject an obsolete lookalike block.

Explore

Original inert training rig. No line movement, engineering tolerance, restart authority or native product acceptance.

Three connected procedures

Read the task drafts.

Concept training draft

Source and format-part briefing

MFG-CV01-P01 · 12 steps · draft D1

Explore

Concept training draft

Block seating and guide-motion rehearsal

MFG-CV01-P02 · 12 steps · draft D1

Explore

Concept training draft

First-piece exception and assessor handoff

MFG-CV01-P03 · 12 steps · draft D1

Explore

Choose the next action.

The five-part work package

Context: permitted sources and asset identity. Practice: meaningful decisions and recovery. Execution: a separately reviewed supervised task. Evidence: observations, measurements and uncertainty. Release: a qualified human approves any reuse.

Discuss this task